To close out the year, Induron is excited to announce its Top Projects of 2023! Our team had the pleasure of working with customers and contractors across the nation to complete these impactful coatings projects. Learn more about each project below!
Project Spotlight
A Coatings Solution for a New Elevated Tank in Frankford, DE
By: Steve Freed, Induron Regional Sales Manager Chicago Bridge & Iron (CB&I) recently manufactured and installed a new 1-million-gallon elevated tank for Tidewater Utilities, Inc. in Frankford, Delaware. Beacon Engineering was selected as the specifying engineer on the project, and Mumford Bjorkman Associates performed the inspection.
Recoating Peotone’s Pedosphere Tank
By: Rob Burckley, Induron Sales Representative The original coating on Peotone, Illinois’s 250,000-gallon pedosphere tank had reached the end of its lifecycle. The tank owner, Aqua Illinois, involved Dixon Engineering as the engineer on the project, Pittsburg Tank & Tower Group as the general contractor, Semper Fi Industrial coatings as the paint contractor, and Induron … Read More
Swansea Wastewater Treatment Plant Refurbishment
By: Paul Powers, Mid-Central Regional Manager for Induron Protective Coatings When the City of Swansea, Illinois realized it was time to bring their water treatment plant back up to their standard of quality, they turned to their long-time engineering firm partner, Thouvenot, Wade and Moerchen, Inc (TWM, Inc). TWM, Inc. then turned to Induron Protective … Read More
Project Spotlight: Brighton, MI Tank Rehab
By: Rob Burckley, Induron Technical Sales and Service Manager Recently, Induron partnered with G&L Sandblasting and Painting and Dixon Engineering to complete this 770,000-gallon tank for the City of Brighton, Michigan.
Restoring a 5 Million Gallon Ground Storage Tank for Huntsville, Alabama
Restoring Three Ground Storage Tanks for Helena, Alabama
By: Nick Jones, Induron Sales Representative In January of 2022, Garver Engineering put a three-tank project out for bid for the city of Helena, Alabama. A 300k ground storage tank, a 500k ground storage tank, and a 1.5 million gallon ground storage tank required interior and exterior coating.
Restoring the World’s Largest Transistor
By: Steve Freed, Induron Sales Representative For 44 years, Bell Works at Holmdel Complex, in Holmdel Township, New Jersey functioned as a research and development facility, initially for the Bell System and later for Bell Laboratories. Today, the site is the home to numerous offices, retail spaces, restaurants, businesses, and the World’s Largest Transistor.
Refurbishing Concrete Clarifiers with Mortarchem and Ceramasafe 90
By: Paul Powers, Mid-Central Regional Manager at Induron Protective Coatings When three large concrete clarifiers at Adams Field Water Reclamation Facility in Little Rock, Arkansas began showing signs of erosion, owner/engineer Little Rock Water Reclamation Authority contracted Thomas Industrial Coatings to coat the weir troughs before additional loss occurred and more costly repairs were required. … Read More