FEATURED PROJECTS

PROTECTIVE COATINGS

Project: Little Rock Water Reclamation Authority – Clarifier Troughs.
Location: Adams Field Water Reclamation Facility, Little Rock Arkansas.
Completion: Aug. 2022.
Engineer: In House.
Fabricator / Painter: Thomas Industrial Coatings.
Products Used: Mortarchem Cementitious Epoxy Surfacer / Ceramasafe 90 Ceramic Epoxy.
Other: Honorable Mention – JPCL’s Prestige Award.

Project: Texarkana Water Utilities Clarifier Rehabilitation.
Location: Millwood Potable Water Treatment Plant, Ashdown, Arkansas.
Completion: Nov. 2019.
Engineer: TWU – In House.
Contact: Kenny Icenhower, P.E.
Fabricator / Painter: Bazan Painting Co.
Products Used: Aquaclean Epoxy / Permaclean 100 NSF 61/600 Epoxy.

Project: Texarkana Water Utilities Clarifier Rehabilitation.
Location: Wright Patman Water Treatment Plant & Millwood Treatment Plant, Bowie County / Red River County Arkansas.
Completion: March 2022
Engineer: TWU In-House
Contact: Kenny Icenhower, P.E.
Fabricator / Painter: Thomas Industrial Coatings
Products Used: Aquaclean Epoxy / Permaclean 100 NSF 61/600 Epoxy.
Other: Published in CoatingsPro Magazine.

Project: Caseyville Wastewater Treatment Plant, Complete Exterior Refurbishment.
Location: Village of Caseyville Illinois.
Completion: September 2022
Engineer: Thouvenot, Wade and Moerchen, inc.
Contact: Scott Simmons
Fabricator / Painter: Bazan Painting Co.
Products Used: Ceramaprime Epoxy Primer, Induramastic 85 Epoxy, Indurathane 6600 Plus Urethane, AC 403 Elastomeric, P-30 Universal Primer, Indurlux 7600 polysiloxane Finish.

Project: Ralls County New Water Treatment Facility
Location: Hannibal Missouri
Completion: September 2018
Engineer: Klingner & Associates – Hannibal Office.
Contact: Matt Suhadolc
Fabricator / Painter: RP Coatings
Products Used: E-bond 100 Penetrant Epoxy, EFS 707 Surfacer, Permaclean 100 NSF 61/600 Epoxy., AC 303, Induramastic 85 Epoxy, Permaclean II Epoxy, Perma-Tuff SL Epoxy Floor Coating.

Project: Monroe City New Waste Treatment Plant
Location: Monroe City Missouri
Completion: March 2023
Engineer: Klingner & Associates – Hannibal Office.
Contact: Mark Bross, P.E.
Fabricator / Painter: Custom Coatings Mid-west.
Products Used: Polyfil Epoxy Block Filler, AC 303 WB Epoxy, Ceramaprime, Permaclean II Epoxy.

Project: MSD Louisa & Arsenal Street Pump Stations.
Location: St. Louis Mississippi Levee District.
Completion: October 2022
Engineer: Thouvenot, Wade & Moechen, Inc.
Contact: Chad Ross
Fabricator / Painter: Genesis Environmental Solutions, Inc.
Products Used: Mortarchem Epoxy Surfacer, EFS 707 Surfacer, Ceramasafe 90 Epoxy

Project: Wastewater Plant exterior Refurbishment
Location: City of Swansea IL.
Completion: November 2022
Engineer: Thouvenot, Wade & Moerchen, Inc.
Contact: Scott Simmons
Fabricator / Painter: RP Coatings
Products Used: Induramastic 85 Epoxy, Indurathane 6600 plus Urethane.

Project: 500KGal Hydropillar – Tidewater Utilities, subsidiary of Middlesex Water
Location: Millsboro, DE
Completion: 2024
Engineer: Tidewater Utilities
Contact: Greg Coury
Fabricator / Painter: US Tank Painting
Products used: Inside System: Ceramaprime LV/RC70/PC100
Outside System: Ceramaprime LV/Permastic LV/Permagloss

Project: 2MGal GST – Aqua NJ
Location: Phillipsburg, NJ
Completion: 2023
Engineer: MBA
Contact: Andy Mumford
Fabricator / Painter: US Tank Painting
Products used: Inside System: Ceramaprime/PE70/PC100
Outside System: Ceramaprime/PE70/Permagloss

Project: 500KGal GST – Veolia NJ
Location: Toms River, NJ
Completion: 2023
Engineer: MBA
Contact: Andy Mumford
Fabricator / Painter: Allied Painting
Products used: Inside System: Ceramaprime/PE70/PC100
Outside System: Ceramaprime/PE70/Permagloss

Project: 150KGal Elevated Spheroid – Pemberton Township
Location: Pemberton NJ
Completion: 2023
Engineer: N/A
Contact: Charlie Raketic – Manda Corp.
Fabricator / Painter: Manda Corp.
Products used: Inside System: Ceramaprime/PE70/PC100
Outside Overcoat: I-85 spot prime/E-Bond100/Indurethane 6600+

Project: 500KGal Standpipe – Aqua PA
Location: West Chester, PA
Completion: 2023
Engineer: MBA
Contact: Andy Mumford
Fabricator / Painter: Allied Painting
Products used: Inside System: Ceramaprime/PE70/PC100
Outside System: Ceramaprime/PE70/ Indurethane 6600
Project: 1MGal Elevated Spheroid - Tidewater Utilities, subsidiary of Middlesex Water
Location: Millville, DE
Completion: 2022
Engineer: MBA
Contact: Andy Mumford
Fabricator / Painter: Chicago Bridge & Iron
Products used: Inside System: Indurazinc MC67/PE70/PC100
Outside System: Indurazinc MC67/PE70/Permagloss

Project: 1MGal Standpipe – Aqua OH
Location: Campbell, OH
Completion: 2022
Engineer: Dixon Engineering
Contact: Shannon Vidika
Fabricator / Painter: George Kountoupes Painting Co.
Products used: Inside System: Ceramaprime/PE70/PC100
Outside System: Ceramaprime/PE70/ Indurethane 6600+

Project: Koch & Bangert Pools
Location: City of Florissant Missouri
Completion: July 2024
Engineer: Contractor Specification
Contact: Eric Hellwig
Fabricator / Painter: Bazan Painting Co.
Products Used: Permaclean II Chemical Resistant Epoxy

Virtual Treatment PlantExplore