FEATURED PROJECTS
PROTECTIVE COATINGS
Project: Little Rock Water Reclamation Authority – Clarifier Troughs.
Location: Adams Field Water Reclamation Facility, Little Rock Arkansas.
Completion: Aug. 2022.
Engineer: In House.
Fabricator / Painter: Thomas Industrial Coatings.
Products Used: Mortarchem Cementitious Epoxy Surfacer / Ceramasafe 90 Ceramic Epoxy.
Other: Honorable Mention – JPCL’s Prestige Award.
Project: Texarkana Water Utilities Clarifier Rehabilitation.
Location: Millwood Potable Water Treatment Plant, Ashdown, Arkansas.
Completion: Nov. 2019.
Engineer: TWU – In House.
Contact: Kenny Icenhower, P.E.
Fabricator / Painter: Bazan Painting Co.
Products Used: Aquaclean Epoxy / Permaclean 100 NSF 61/600 Epoxy.
Project: Texarkana Water Utilities Clarifier Rehabilitation.
Location: Wright Patman Water Treatment Plant & Millwood Treatment Plant, Bowie County / Red River County Arkansas.
Completion: March 2022
Engineer: TWU In-House
Contact: Kenny Icenhower, P.E.
Fabricator / Painter: Thomas Industrial Coatings
Products Used: Aquaclean Epoxy / Permaclean 100 NSF 61/600 Epoxy.
Other: Published in CoatingsPro Magazine.
Project: Caseyville Wastewater Treatment Plant, Complete Exterior Refurbishment.
Location: Village of Caseyville Illinois.
Completion: September 2022
Engineer: Thouvenot, Wade and Moerchen, inc.
Contact: Scott Simmons
Fabricator / Painter: Bazan Painting Co.
Products Used: Ceramaprime Epoxy Primer, Induramastic 85 Epoxy, Indurathane 6600 Plus Urethane, AC 403 Elastomeric, P-30 Universal Primer, Indurlux 7600 polysiloxane Finish.
Project: Ralls County New Water Treatment Facility
Location: Hannibal Missouri
Completion: September 2018
Engineer: Klingner & Associates – Hannibal Office.
Contact: Matt Suhadolc
Fabricator / Painter: RP Coatings
Products Used: E-bond 100 Penetrant Epoxy, EFS 707 Surfacer, Permaclean 100 NSF 61/600 Epoxy., AC 303, Induramastic 85 Epoxy, Permaclean II Epoxy, Perma-Tuff SL Epoxy Floor Coating.
Project: Monroe City New Waste Treatment Plant
Location: Monroe City Missouri
Completion: March 2023
Engineer: Klingner & Associates – Hannibal Office.
Contact: Mark Bross, P.E.
Fabricator / Painter: Custom Coatings Mid-west.
Products Used: Polyfil Epoxy Block Filler, AC 303 WB Epoxy, Ceramaprime, Permaclean II Epoxy.
Project: MSD Louisa & Arsenal Street Pump Stations.
Location: St. Louis Mississippi Levee District.
Completion: October 2022
Engineer: Thouvenot, Wade & Moechen, Inc.
Contact: Chad Ross
Fabricator / Painter: Genesis Environmental Solutions, Inc.
Products Used: Mortarchem Epoxy Surfacer, EFS 707 Surfacer, Ceramasafe 90 Epoxy
Project: Wastewater Plant exterior Refurbishment
Location: City of Swansea IL.
Completion: November 2022
Engineer: Thouvenot, Wade & Moerchen, Inc.
Contact: Scott Simmons
Fabricator / Painter: RP Coatings
Products Used: Induramastic 85 Epoxy, Indurathane 6600 plus Urethane.
Project: 500KGal Hydropillar – Tidewater Utilities, subsidiary of Middlesex Water
Location: Millsboro, DE
Completion: 2024
Engineer: Tidewater Utilities
Contact: Greg Coury
Fabricator / Painter: US Tank Painting
Products used: Inside System: Ceramaprime LV/RC70/PC100
Outside System: Ceramaprime LV/Permastic LV/Permagloss
Project: 2MGal GST – Aqua NJ
Location: Phillipsburg, NJ
Completion: 2023
Engineer: MBA
Contact: Andy Mumford
Fabricator / Painter: US Tank Painting
Products used: Inside System: Ceramaprime/PE70/PC100
Outside System: Ceramaprime/PE70/Permagloss
Project: 500KGal GST – Veolia NJ
Location: Toms River, NJ
Completion: 2023
Engineer: MBA
Contact: Andy Mumford
Fabricator / Painter: Allied Painting
Products used: Inside System: Ceramaprime/PE70/PC100
Outside System: Ceramaprime/PE70/Permagloss
Project: 150KGal Elevated Spheroid – Pemberton Township
Location: Pemberton NJ
Completion: 2023
Engineer: N/A
Contact: Charlie Raketic – Manda Corp.
Fabricator / Painter: Manda Corp.
Products used: Inside System: Ceramaprime/PE70/PC100
Outside Overcoat: I-85 spot prime/E-Bond100/Indurethane 6600+
Project: 500KGal Standpipe – Aqua PA
Location: West Chester, PA
Completion: 2023
Engineer: MBA
Contact: Andy Mumford
Fabricator / Painter: Allied Painting
Products used: Inside System: Ceramaprime/PE70/PC100
Outside System: Ceramaprime/PE70/ Indurethane 6600
Project: 1MGal Elevated Spheroid - Tidewater Utilities, subsidiary of Middlesex Water
Location: Millville, DE
Completion: 2022
Engineer: MBA
Contact: Andy Mumford
Fabricator / Painter: Chicago Bridge & Iron
Products used: Inside System: Indurazinc MC67/PE70/PC100
Outside System: Indurazinc MC67/PE70/Permagloss
Project: 1MGal Standpipe – Aqua OH
Location: Campbell, OH
Completion: 2022
Engineer: Dixon Engineering
Contact: Shannon Vidika
Fabricator / Painter: George Kountoupes Painting Co.
Products used: Inside System: Ceramaprime/PE70/PC100
Outside System: Ceramaprime/PE70/ Indurethane 6600+
Project: Koch & Bangert Pools
Location: City of Florissant Missouri
Completion: July 2024
Engineer: Contractor Specification
Contact: Eric Hellwig
Fabricator / Painter: Bazan Painting Co.
Products Used: Permaclean II Chemical Resistant Epoxy
Our Products
Why Induron
At Induron, we invest ourselves in your success, your satisfaction, and your reputation. It’s why—for example—we won’t specify the most expensive option.
Find a Rep
At Induron, we invest ourselves in your success, your satisfaction, and your reputation.