Featured Projects

Repaint Turbine Deck Floor at JP Madgett Power Plant

Location: Alma, WI
Year: 2015
Painting Contractor: Rogers Paint Company
Products Used: Primer – E-Bond 100% Solids Sealer
Finish – Perma-Clean II High Gloss Epoxy

The maintenance engineer for the JP Madgett Power Plant asked Mike Rogers of Rogers Paint to repaint the turbine room floor following the installation of a new scrubber at the power plant. The floor was damaged during construction and it needed to be repaired. The plant wanted to stay with a thin film paint system because they are easy to repair if damaged. Following surface preparation, the floor was sealed with Induron’s E-Bond 100% Solids Epoxy and the finish coat was Induron’s Perma-Clean II High Gloss Epoxy Sky Gray.